Building Dreams on Unbuildable Land: Overcoming Summit County’s Septic System Challenges with an Alternative Septic System

Located in Summit County, UT, Bear Hollow Family Cabin faced foreclosure twice due to a high water table that prevented the installation of a standard septic system. Anderson Engineering designed an alternative septic system that met state requirements and developed a site plan to address drainage challenges. These solutions allowed the client to secure the necessary permits, enabling construction of their family cabin. Furthermore, the client was able to purchase the lot at a significant discount below current market rates. This cost-saving enabled enhanced build quality and the addition of family amenities, such as a zip line, kayaking pond, and sledding hill, making it a truly enjoyable retreat.

With a custom-engineered alternative septic system, Anderson Engineering enabled the successful construction of Bear Hollow Family Cabin, unlocking new opportunities for quality living.

Challenge

The Bear Hollow property faced foreclosure twice due to a high water table that prevented septic system installation, complicating development and blocking construction efforts.

Solution

Anderson Engineering designed an alternative septic system and developed a site plan to manage drainage, meeting state and county requirements.

Benefits

By partnering with Anderson Engineering, the general contractor transformed a historically challenging property into a successful development site. Their expertise enabled the construction of the Bear Hollow Family Cabin, leading to cost savings and improved quality, which helped the client achieve their vision and enhance the property's value.

Discover the Full Scope of the Project

Gain insight into the decisions, challenges, and creative solutions that brought this project to life.

a cabin in summit county, utah with an approved septic system permit. This cabin uses an alternative septic system.

Challenge

The Bear Hollow Family Cabin site in Summit County had proven to be a significant challenge for previous owners. The property’s high water table made installing a standard septic system impossible, and poor soil drainage added to the complexity. As a result, the property was foreclosed twice, as multiple owners failed to secure building permits due to these issues. Additionally, Summit County’s stringent building requirements further complicated the process, making development attempts unviable and leading to significant financial losses. The inability to obtain a suitable septic solution meant the land was undeveloped, causing delays, increased costs, and ongoing frustration. The new client, a general contractor, aimed to break this cycle and build a family cabin but was confronted with obstacles blocking previous efforts.

Solution

Anderson Engineering provided a comprehensive solution for the Bear Hollow Family Cabin project to address the challenges of a high water table and poor soil drainage. The team designed an alternative septic system capable of functioning effectively in challenging conditions, ensuring that the solution met all State of Utah regulations. In addition to the septic design, Anderson Engineering created a site plan specifically tailored to manage soil drainage and mitigate the high water table risks. Considering Summit County’s stringent building requirements, this plan was developed to ensure that both the septic system and construction permits could be approved. By applying innovative engineering techniques and leveraging their knowledge of local regulations, Anderson Engineering provided the client with a viable path forward, transforming what had been deemed unbuildable land into a promising site for a family cabin.

Benefits and Impacts

By partnering with Anderson Engineering, the general contractor transformed a property with significant historical challenges into a successful development site. Anderson Engineering’s expertise not only enabled the construction of the Bear Hollow Family Cabin but also provided significant cost savings and enhanced the quality of the final development. These benefits were instrumental in helping the client achieve their vision while adding value to the property.

Successful Cabin Construction: Enabled permit approvals and cabin construction.

Cost Savings on Property Purchase: The lot was purchased significantly below the market value.

Enhanced Amenities: Added quality family amenities like a zip line, kayaking pond, and sledding hill.

Ready to Turn Your Vision into Reality? Let's Talk

In-Depth Project Narrative

Building Dreams on Unbuildable Land: Overcoming Summit County’s Septic System Challenges with an Alternative Septic System.

Table of Contents

The Bear Hollow Family Cabin project exemplifies how Anderson Engineering’s expertise can transform even the most challenging sites into thriving, buildable properties. Situated in Summit County, UT, this property had a troubled history of development failures due to a high water table and inadequate soil drainage. These complications led to foreclosure twice, rendering the land seemingly unbuildable. Previous owners faced unmanageable obstacles in their attempts to develop the lot, ultimately failing to secure permits. Anderson Engineering stepped in with a targeted approach to turn things around. Anderson Engineering addressed the environmental and regulatory hurdles that had stymied development by designing a custom-engineered alternative septic system and creating a strategic site plan. This project allowed the client to achieve their vision of a family retreat. It showcased Anderson Engineering’s commitment to innovative problem-solving, compliance, and adding real value to properties that others deemed unviable.

Problem

The Bear Hollow Family Cabin site was fraught with significant challenges, making development an ongoing struggle for previous owners. The property’s high water table created an environment unsuitable for a traditional septic system, as groundwater levels were too close to the surface, preventing effective wastewater management. Poor soil drainage conditions further compounded these issues, making it difficult to establish any functional infrastructure. As a result, multiple development attempts failed, leading to the property being foreclosed upon twice. The inability to solve the septic issue meant the land remained in a state of disuse, creating a financial burden for owners and leaving a valuable asset underutilized. Summit County’s stringent building requirements presented yet another layer of difficulty, with specific regulations that made it hard to implement conventional solutions. For the client, a general contractor, these compounded challenges were especially problematic; any delays or additional costs could derail their ability to complete the family cabin project, further risking the economic viability of the investment. The stakes were high—overcoming these obstacles was about making the property buildable and reclaiming its value and potential.

  1. High Water Table: Groundwater levels were too close to the surface, preventing using a traditional septic system.
  2. Poor Soil Drainage: Inadequate drainage conditions compounded the difficulty of establishing a reliable infrastructure.
  3. Stringent Building Requirements: Summit County’s regulations were particularly challenging, making standard development solutions unworkable.
  4. Financial Burden: Failed development attempts led to multiple foreclosures, deterring potential developers and decreasing

Solution

Faced with the daunting challenges of the Bear Hollow Family Cabin site, Anderson Engineering devised a multi-faceted approach that addressed both the high water table and poor soil drainage. The cornerstone of the solution was an alternative septic system that could function effectively under challenging groundwater conditions. Standard septic solutions were not feasible due to the high water table. Anderson Engineering engineered a system with elevated components and enhanced filtration to prevent contamination and ensure efficiency. The design met all State of Utah regulations, which was crucial in gaining approval for the septic system, something no previous owner had managed to accomplish.

  • Alternative System Design – Designed an elevated septic system with enhanced filtration, ensuring it met State of Utah regulations for challenging groundwater conditions.
  • Drainage Management – Developed a site plan with strategic grading and drainage systems to manage the high water table and improve soil stability.
  • Collaboration with County – Worked closely with Summit County officials to ensure all requirements were met, expediting the permitting process and avoiding delays.

Beyond the septic solution, Anderson Engineering developed a site plan that addressed the high water table’s drainage challenges. This plan included strategic grading and drainage systems to divert water from critical areas, ensuring that soil conditions remained stable enough to support construction. By integrating this drainage strategy, Anderson Engineering mitigated the water pooling and erosion risk, making the site suitable for sustainable development.

Summit County’s stringent building requirements demanded careful planning and a thorough understanding of local regulations. Anderson Engineering worked closely with county officials to ensure that all aspects of the project complied with the existing codes and standards. This collaborative approach smoothed the permitting process and accelerated approvals, allowing the client to proceed without unnecessary delays. Throughout the project, Anderson Engineering applied innovative engineering techniques and leveraged its deep knowledge of local requirements, transforming a seemingly hopeless property into a viable site for a family cabin. The alternative septic system, coupled with an effective site drainage plan, allowed for construction permits to be issued, ultimately enabling the realization of the client’s vision. This transformation is a testament to Anderson Engineering’s dedication to providing custom, problem-specific solutions for complex land development challenges.

Results and Benefits

The results of Anderson Engineering’s intervention were transformative, allowing the Bear Hollow Family Cabin project to move forward where others had stalled. The successful design and implementation of an alternative septic system overcame the core issue that had rendered the property undevelopable for years. With the septic system approved and site drainage addressed, the client obtained all necessary building permits, finally enabling construction to begin.

  • Successful Permitting – Enabled development through innovative septic and site drainage solutions.
  • Cost Savings – Lot purchased below market value, allowing increased investment in building quality.
  • Enhanced Amenities – Savings facilitated the addition of family-friendly features, boosting property value.

One significant benefit for the client was the ability to purchase the lot at a significant discount due to its troubled history, which had deterred other potential buyers. These cost savings were reinvested into the project, allowing for higher-quality construction and including unique amenities like a zip line, kayaking pond, and sledding hill. These additions increased the family’s enjoyment of the property and its overall value.

The project’s successful completion demonstrated Anderson Engineering’s capacity to tackle complex, high-risk properties, providing viable solutions where others could not. The Bear Hollow Family Cabin is now a thriving family retreat—a testament to the value of innovative engineering in overcoming even the toughest land development challenges.

If you face similar land development challenges— regulatory hurdles, difficult environmental conditions, or unviable infrastructure—Anderson Engineering has the expertise to turn things around. Our team specializes in developing innovative, tailored solutions that comply with all regulations while maximizing the value of your property. Let us help you overcome obstacles and bring your project to life. Contact us today for a free consultation and see how we can make your development goals a reality. Together, we can transform even the most challenging properties into thriving projects.

a house in a grassy area with a pond with an alternative septic system

Comprehensive Engineering Solutions

Full List of Services Provided For This Project

Structural Design for New Construction
Site Design and Planning
Environmental Permitting
Grading and Earthwork Design
Water Resource Engineering
Construction Management and Oversight
Regulatory Compliance Consulting

Disclaimer: This summary includes AI-generated content and project-specific details that may not apply to your project. For personalized advice, contact Anderson Engineering—we’re here to help!